REPLACEMENT OF BRIDGE SOMERDALE ROAD OVER NORTH BRANCH OF TIMBER CREEK, STRUCTURE NO. 046C021
Name of Project: #B14-24, Replacement of Somerdale Road (CR 677) Bridge #046C021 over North Branch of Timber Creek, Gloucester Township, Camden County, New Jersey
Start Date: On or about Monday, January 6, 2025 (Weather Permitting)
Contract Time: 760 Calendar Days (Weather Permitting)
Limits: Bridge Replacement
Project Highlights:
- Removal of an existing single span concrete rigid frame, wingwalls and timber sheeting and pile supported concrete footing
- new single span precast concrete frame with cast in place reinforced concrete 100-6 wingwalls founded on cast in place reinforced concrete footings supported on 12” diameter concrete filled steel pipe piles.
- Concrete Curb, Curb Ramps, Concrete Sidewalk (If & where directed) Inlets and Manholes, Reconstruct Inlets, Installation of Type Double B Inlets, Reinforced Concrete Storm Pipe, Ductile Iron Storm Pipe, Raised Pavement Markers, Traffic Striping
Total Estimated Costs: $3,705,713.13
Any Questions Contact: Richard Parisi Project Manager, of Childs Engineering, at 215.264.6009 and/or James Winckowski, County Engineer, Camden County Division of Engineering at 856.382.2699
NOTE: All work at the Somerdale Road Bridge will be performed in accordance with Section 159.03 and will maintain a minimum of one (1) lane in each direction along Somerdale Road during Stage 1 and 3 constructions. In Stage 2, two lanes of vehicular traffic shall be maintained during the day between the hours of 5am until 7pm. A full detour of Somerdale Road shall be permitted overnight during stage 2. The minimum staging requirements are two (2) lanes of vehicular traffic without sidewalk as well as accommodation of the installation of drainage improvements.